Ports

Colonial Terminals Launches Foundation 3 Breakbulk Hub at Port of Savannah

FW Desk News

FreightWatch.News

·

Wednesday, September 9, 2026

Colonial Terminals has commissioned Foundation 3, a 25-acre multimodal breakbulk terminal along the Savannah River designed to bolster the port region's capacity for bulk and project cargo. The facility operates around the clock with an 810-foot heavy-capacity dock providing direct vessel access. The terminal includes two warehouses spanning 130,000 square feet, a 75,000-square-foot concrete storage yard, and more than 14,000 feet of onsite rail track with terminal-operated switching. Norfolk Southern Class I rail service connects the facility to interstate commerce. Direct access to Interstates 16 and 95 enables truck movements. Foundation 3 handles steel, forest products, project cargo, palletized goods, super sacks, and general breakbulk commodities. Both union and non-union stevedoring services are available. Colonial Terminals said the investment strengthens Savannah's competitive standing in breakbulk and industrial cargo markets alongside its established container capabilities.

More Ports coverage

Container Rates Hold Firm as Carriers Manage Capacity Ahead of Peak SeasonContainer Rates Hold Steady as Carriers Deploy Blanked SailingsCyber Attack Forces Brief Shutdown at Malaysia's Tanjung Pelepas PortFlexport Chief's 9/11 Game Post Draws Industry CriticismTwenty-five killed in cargo ship fire at Qingdao repair facilityPort of Los Angeles Caps Record Summer Quarter as Holiday Cargo Floods DocksAll Ports news →
← Back to Freightwatch.news